Construction of the new Greenwood High School Freshman Center required excavation immediately adjacent to the existing High School building. Underpinning of the existing building was done first, then the excavation was accomplished in lifts as a soil nail wall was constructed.
FSGC's role was to underpin the existing building with 37 steel piers and install 61 soil nails for for excavation support.
Bentonville, AR
Tulsa, Oklahoma
North Little Rock, AR
OWNER: Greenwood, AR Public Schools
CONSTRUCTION MANAGER: Beshears Construction
ARCHITECTURAL FIRM: MAHG Architecture
STRUCTURAL ENGINEER: Myers-Beatty Engineering
GEOTECHNICAL ENGINEER: Data Testing, Inc.
EXCAVATION SUPPORT SYSTEM DESIGN ENGINEER: J. L. Burke Structural Engineering
TO LEARN MORE ABOUT THE GREENWOOD H.S. FRESHMAN CENTER CLICK HERE.
FSGC is committed to safety, service, and excellence. We look forward to partnering with you to design and build the best solutions for your project.
Foundation Specialties Geo-Structural Construction
881 Hatcher Rd, Springdale, AR 72764
Copyright © 2022 - All Rights Reserved.
This website uses cookies. By continuing to use this site, you accept our use of cookies.