The Hot Springs Creek Greenway Trail runs through town along the historic waterway and will eventually link downtown Hot Springs, AR with Lake Hamilton, 4.5 miles to the south. The 276' long Phase V section of the trail, just north of Golf Links Road, is very narrow and uneven. It was determined that an elevated boardwalk would be the most cost-efficient way to extend the trail through this difficult section.
The FSGC team designed and installed the micropiles, steel pile caps, and steel bridge bents to support the pre-fabricated concrete trail bridge.
Bentonville, AR
Tulsa, Oklahoma
North Little Rock, AR
OWNER: City of Hot Springs, AR / ARDOT
GENERAL CONTRACTOR: Cate Construction
STRUCTURAL ENGINEER: B & F Engineering
GEOTECHNICAL ENGINEER: Terracon
MICROPILE DESIGN ENGINEER: J. L. Burke Structural Engineering
MICROPILE BRIDGE SUPPORTS:
TO LEARN MORE ABOUT THE HOT SPRINGS CREEK GREENWAY TRAIL CLICK HERE.
FSGC is committed to safety, service, and excellence. We look forward to partnering with you to design and build the best solutions for your project.
Foundation Specialties Geo-Structural Construction
881 Hatcher Rd, Springdale, AR 72764
Copyright © 2022 - All Rights Reserved.