PROJECT HIGHLIGHT: OZARK NATIONAL FOREST SLOPE STABILIZATION

A landslide in the Ozark-St. Francis National Forest took out a section of Forest Development Road 1003.  The Federal Highway Administration prepared a plan to reconstruct the road using soil nails and high tensile wire mesh.


FSGC installed 102 Soil Nails and 9,400 SF TECCO Mesh High Tensile wire mesh for the project.

Project Details

RELATED PROJECTS

CRYSTAL BRIDGES MUSEUM

Bentonville, AR

Find out more

A GATHERING PLACE FOR TULSA

Tulsa, Oklahoma

Find out more

NORTH CEDAR ST. SLIDE REPAIR

North Little Rock, AR

Find out more

Project Details

OWNER: U.S. Department of Transportation, Federal Highway Administration, Eastern Federal Lands Highway Division


GENERAL CONTRACTOR: Aldridge Brothers, Inc.


GEOTECHNICAL ENGINEERS: Schnabel Engineering; Grubbs, Hoskyn, Barton & Wyatt


SOIL NAIL DESIGN ENGINEER: J. L. Burke Structural Engineering


Contact FSGC

FSGC is committed to safety, service, and excellence.  We look forward to partnering with you to design and build the best solutions for your project.

CONTACT US

FSGC is a member of:

image118
image119